Installation Instructions

P-100 PUTTER

Heads

  • Cut shaft

    at 5.625” HEIGHT (not length - measure height at resting lie angle)

  • Abrade shaft

    0.625” of trimmed section

  • Clean abraded shaft tip

    (acetone recommended)

  • Abrade inside

    of Putter Hosel Adapter

  • Clean inside

    (cotton swab and acetone recommended)

  • Apply epoxy

    to shaft tip and inside of adapter

  • MUST install adapter onto shaft

    with indicator line parallel to the putter face

  • Wipe excess epoxy

  • Allow epoxy to fully

    cure before handling again

Heads

  • Cut shaft

    at 5.625” HEIGHT (not length - measure height at resting lie angle)

  • Abrade shaft

    0.625” of trimmed section

  • Clean abraded shaft tip

    (acetone recommended)

  • Abrade inside

    of Putter Hosel Adapter

  • Clean inside

    (cotton swab and acetone recommended)

  • Apply epoxy

    to shaft tip and inside of adapter

  • MUST install adapter onto shaft

    with indicator line parallel to the putter face

  • Wipe excess epoxy

  • Allow epoxy to fully

    cure before handling again

Shafts

Must reference previously built head w/ p-100

  • Cut shaft

    at 5.625” HEIGHT (not length - measure height at resting lie angle)

  • Abrade shaft

    0.625” of trimmed section

  • Clean abraded shaft tip

    (acetone recommended)

  • Abrade inside

    of Putter Hosel Adapter

  • Clean inside

    (cotton swab and acetone recommended)

  • Apply epoxy

    to shaft tip and inside of adapter

  • MUST install adapter onto shaft

    with indicator line parallel to the putter face

  • Wipe excess epoxy

  • Allow epoxy to fully

    cure before handling again

Back to P-100 Product Knowledge

Shafts

Must reference previously built head w/ p-100

  • Cut shaft

    at 5.625” HEIGHT (not length - measure height at resting lie angle)

  • Abrade shaft

    0.625” of trimmed section

  • Clean abraded shaft tip

    (acetone recommended)

  • Abrade inside

    of Putter Hosel Adapter

  • Clean inside

    (cotton swab and acetone recommended)

  • Apply epoxy

    to shaft tip and inside of adapter

  • MUST install adapter onto shaft

    with indicator line parallel to the putter face

  • Wipe excess epoxy

  • Allow epoxy to fully

    cure before handling again

Back to P-100 Product Knowledge